PM MITRA Uttar Pradesh, Lucknow

Lucknow, UP hosts a 1,000-acre PM MITRA Park with cotton supply, strong industry, and excellent connectivity.

icon
Connectivity
icon
Site Progress
icon
Lucknow Edge
icon
Facilities
icon
Conducive Policy
icon
Layout
icon
Downloads
icon
Meet Us At
icon
Connect With Us

About PM MITRA Lucknow

icon Salient Features
  • Land area: 1000 acres (~4.05 sq. km)
  • Project cost: INR 1,736 Cr (~USD 192.9 million)
  • Implementation model: Greenfield PPP MD Led
icon Offerings
  • Industrial plots: 549 acres
  • Green Spaces: 112.08 acres
  • Plug-and-Play Units: ~ 100 acres
  • Water Supply and Drainage: 16 MLD from STP
  • Power Infrastructure: 110 MW from 132 KVA Sub-Station
icon Projected Outcomes
  • Direct jobs: 1,00,000
  • Investment: INR 10,000+ Cr
icon Competitive Costs
  • Power: Rs 3.795 / unit
  • Water: Rs 1.11 / KL
icon Features
• Plug and Play Units • ZLD CETP • Common Facility Center
• Single Window Clearance • Encumbrance Free Land  

Connectivity

Highway

15 km

NH-731
Lucknow–Hardoi

Railway

15 km

Malihabad
Railway Station

Airport

45 km

Lucknow
International Airport

Port

97 km

Eastern DFC
Connected via NH-27

Logistics

ICD

Planned in park

 

Infrastructure Status Overview

Land and site development

Site office construction Boundary wall (24.09 km) 70%
Gate complex – 15%
Office renovation – 45%

Completed
Access roads

Upgradation of existing 8.4 km road – 75% Greenfield 4-lane road (14.28 km) under pre-construction Bridge on River Gomti – 85%

Completed
Water Supply (external)

16 MLD pipeline from STP Daulatganj (29.5 km) sanctioned 8.25 MLD potable water from River Gomti (16.7 km) under tendering

N/A
Water Supply (Internal)

5+1 tubewells planned with total capacity of 4.5 MLD

N/A
Power

132 kV receiving sub-station with 26 km transmission line under contractor selection

N/A

The PM MITRA Lucknow Edge

icon
Land

Fully planned trunk infrastructure including roads, drainage, power, water, and common amenities.

icon
EoDB

EC and DTCP approvals in place

icon

Design and innovation acumen

• National Institute of Fashion Technology, Raebareli
• Northern India Textile Research Association (NITRA) Technical Campus, Ghaziabad
icon
Entrepreneurial ecosystem

Textile Clusters
Lucknow, Farrukhabad, Kanpur, Sitapur
Handloom Clusters
Barabanki, Hardoi, Unnao, Shahjahanpur

Facilities

  • Zoned industrial plots separated from residential and commercial uses

  • Internal road network with access to highways and rail connectivity

  • Assured availability of power, water supply, sewerage, and drainage systems

  • Provision for hazardous and non-hazardous waste management

  • Built-in safety systems for industrial machinery and operations

  • Flexible land parcels to allow future expansion of units

  • Covered warehouses for storage of raw materials and finished goods

  • Facilities for product stockpiling

  • Value-added services including inventory management and cost-control planning

  • Dedicated truck terminal within the park premises

  • Parking bays for inbound and outbound trucks

  • Weighbridges for 100% of truck movements

  • Driver support facilities including restrooms, lodging, and workshops

  • Average truck dwell time planned at 6 hours

  • transmission and distribution network with power back-up

  • Water treatment and storage facilities

  • Sewerage Treatment Plant and recycled water network

  • Stormwater drainage and rainwater harvesting system

  • Solid waste management system

  • Telecom and ICT network

  • Fire station, police station, weighbridges, and fuel station within park limits

  • Residential tenements
  • Dormitories / hostels for workers
  • Commercial and office complexes
  • Restaurants and recreational facilities
  • Green buffers separating industrial and social zones
 
  •  
  • Secured entry and exit gates with document verification and weighing
  • Administrative office near the main gate for park management
  • Central monitoring room for intelligent security management
  •  
  •  
  • Common Effluent Treatment Plant (Zero Liquid Discharge)
  • Power back-up systems
  • Telecommunication network
  • Rainwater harvesting wells
  • Solar energy provisions
  • Fire safety infrastructure and disaster control room
  • E-security system with centralized surveillance
  •  
  • Commercial buildings housing shops, banks, offices, and service providers
  • Offices for clearing & forwarding agents and transporters
  • Fuel station accommodating long trailers with multiple pumps
  • Truck repair workshop within transport hub

Conducive Policy

  • 100% exemption on stamp duty for eligible units
  • Reimbursement of 25% of land cost

  • MSMEs: 15% capital subsidy

  • Large Units (investment up to ₹100 Cr): 25% capital subsidy

  • Reimbursement of 60% of the annual interest paid by the unit

  • 75% reimbursement for first 2 years

  • 50% reimbursement for next 2 years

  • 25% reimbursement in the fifth year

  •  
  • 100% exemption from Electricity Duty for a period of 10 years
  •  
  • ₹3,200 per worker per month for mega and super-mega garmenting units, for a period of 5 years

Layout

Downloads

Land Allotment Policy
Industrial Development Policy
State Textile Policy
State MSME Policy

Meet Us At

icon
Investor Summit

Invest UP is an investment promotion and facilitation agency powered by the state government of UP. Participate and invest in your desired sectors.

icon
Invest India

$2.1 Bn total FDI inflow during October 2019 to June 2025

icon
Indextb

For any queries connect with us

GOVT. OF UTTAR PRADESH
Shri. Anil Kumar Sagar, IAS Principal Secretary
Department of Handloom & Textiles
 
 
pskhadi2025@gmail.com

Shri. K. Vijayendra Pandian, IAS Principal SecretaryCommissioner Director (Handloom & Textiles)
Department of Handloom & Textiles
 
0512-2297181
 
dhtup@rediffmail.com

Lets Get Started With Your Enquiry

Submit your enquiry and our team will get back to you shortly.