About PM MITRA Warangal
- Land area: 1327 acres (~5.37 sq. km)
- Project cost: INR 1,696 Cr. (~USD 188 million)
- GoI grant: INR...Cr (...m USD)
- Implementation model: Brownfield shrough SIA
- Industrial plots: 866 acres
- Green Spaces: 164.77 acres
- Plug-and-Play Units
- Water Supply and Drainage
- Power Infrastructure
- Solar Power Plant
- Direct jobs: 24,400+
- Investment: INR 3800 + Cr (~USD 458 million)
- Sustainability rating: (coming soon)
- Power: Rs 4.15 / unit
- Water: Rs 40 / KL
| • Plug and Play Units | • ZLD CETP | • Common Facility Center |
| • Single Window Clearance | • Encumbrance Free Land | • Common Boiler |
Connectivity
NH-163
National Highway
17.3km
14.1 km
Warangal
Railway Station
190 km
International Rajiv Gandhi Airport
350 km
Machilipattnam
Vizag Port
184 km
BATCO Integrated Logistic Park
The PM MITRA Warangal Edge
Land
Fully planned trunk infrastructure including roads, drainage, power, water, and common amenities.
EoDB
EC and DTCP approvals in place
Design and innovation acumen
• Southern India Mills Association (SIMA)
Entreprenuurial ecosystem
Textile Clusters
Sircilla, Pashamylaram, Malkapur, Rangareddy
Weaving Clusters
Sircilla, Nalgonda, Karimnagar, Warangal
Facilities
- Common Effluent Treatment Plant (CETP) with Zero Liquid Discharge (ZLD)
- Designed effluent generation of ~10 MLD, developed in 2 phases of 5 MLD each
- 1 × 5 MLD CETP unit under final stages of completion
- Treated water 100% recycled back to units with real-time PLC–SCADA monitoring
- Dedicated state-of-the-art Textile Testing Laboratory within the park
- Testing facility to be operated through reputed private labs or Govt./Semi-Govt. institutions (SITRA, Textile Committee, NABL)
- Supports chemical, physical and specialized textile testing requirements
- Dedicated Skill Development Centre within Common Facilities Zone
- Training capacity of ~450–500 trainees per month
- Focus on apparel, knitting, textile processing, advanced machinery & quality control
- ~2.89 acres earmarked at a centralized location
- Admin Building with Testing Centre – 6,433 sq. m (1.59 acres)
- Skill Development Centre – 5,220 sq. m (1.29 acres)
- Plug-and-play Common Warehouse Facility
- 2 warehouses of 7,000 sq. m each (Total 14,000 sq. m)
- PEB sheds with 9 m eave height and 12 m ridge height, accessible via 30 m wide road
- Rooftop solar power system of 1 MW for common infrastructure
- Proposed 20 MW ground-mounted solar park within designated land parcel
- Rainwater harvesting system with canal deepening to ~1.5 m, harvesting pits & stormwater integration
- Centralized Command & Control Centre (CCC) integrated with SCADA
- Real-time monitoring of energy, water usage, CETP performance, air quality & noise levels
- Smart water meters for fresh and recycled water monitoring
- Centralized Common Steam / Boiler Plant of 50 TPH capacity, to be developed in phases
- Supports dyeing, ironing and textile processing units
- 8 common toilet blocks, each of 100 sq. m, strategically located across the park
- 2 acres earmarked for a dedicated Fire Station with modern firefighting systems
- EV charging facilities in 4 zones across the park
- 10 charging points per zone (6 two-wheelers + 4 four-wheelers)
Conducive Policy
- 24×7 Water, Power, Connectivity and CETP at Textile and Apparel Parks
- Plug-and-Play infrastructure for garment manufacturers
- Concessional land price
- Capital Subsidy: 25% of CAPEX up to INR 40 Cr (~USD 4.7 Mn)
- Interest Subsidy: @8% per annum for 8 years
- SGST Reimbursement: 100% for 7 years
- Transport Subsidy: 25%–75% for 5 years
- Availability of skilled manpower
- Training subsidy
- Capacity building support
- Mega projects with minimum INR 200 Cr (USD 24 Mn) investment or creation of 1,000 direct jobs eligible for customised incentive packages
- Companies with INR 200 Cr investment eligible for incentives up to 73% of CAPEX
- Companies with INR 200 Cr investment eligible for incentives up to 88% of CAPEX
- Technical Textiles
- Conventional Textiles
Layout
Meet Us At
Investor Summit
Telangana State Industrial Infrastructure Corporation also known as TSIIC is a Government of Telangana initiative for providing infrastructure through the development of industrial areas in the state of Telangana.
Invest India
Invest India is the National Investment Promotion and Facilitation Agency of the Government of India, set up in 2009 as a not-for-profit company under the Department for Promotion of Industry and Internal Trade (DPIIT), Ministry of Commerce and Industry.
Road Show
Invest India is the National Investment Promotion and Facilitation Agency of the Government of India, set up in 2009 as a not-for-profit company under the Department for Promotion of Industry and Internal Trade (DPIIT), Ministry of Commerce and Industry.
For any queries connect with us
Shri. Sanjay Kumar, IAS Special Chief Secretary
Shri. V Madhusudan CEO (TGIIC)
Lets Get Started With Your Enquiry
Submit your enquiry and our team will get back to you shortly.